Month: March 2013

Uncategorized

Sulit Tech goes to 24th Floor

My new workdesk at the 24th Floor Office.

The Sulit Technical Deparment (mainly the Development Team) relocated to another office but still at the same building. We transferred down to the 24th floor. This was the old Sulit office before transferring at the 40th floor. I’ve stayed for 6 months at the 40th and it was nice to have at least been at …